As of 5 pm, the overall inbound and outbound traffic of Line 16 stations reaches about 73,000, among which the traffic of the south section of Line 16 reaches 27,000. The overall operation is stable and orderly. Among the stations of the south, north and middle section of Line 16, Fengtai Railway station has a larger traffic, with about 12,000 passenger journeys, and Yongfeng station, with about 5,500 passenger journeys.
As of 10 am, the overall inbound and outbound traffic of Line 16 stations reaches about 20,800, among which traffic of the south section of Line 16 reaches 6,126. The overall operation is stable and orderly. Among the stations of the south, north and middle section of Line 16, Fengtai Railway station has a larger traffic, with about 2,788 passenger journeys, and Yongfeng station, with about 1872 passenger journeys.
On the first day that the south section of Line 16 opens and connects with the middle and north section, the operation is organized according to the timetable of weekends, and 268 trains are arranged with eight-minute headway throughout the whole day.