Line 16

Beijing Metro Line 16

 

On November 28, 2015, BJMTR signs the Public-Private Partnership (PPP) Concession Agreement for Beijing Metro Line 16 (BJL16) with Beijing Municipal Government, under which BJMTR could invest in, construct, and operate Line 16 within the concession period of 30 years. The construction of Line 16 consists of part A (tunnels, station structure etc.) and B (rolling stocks, signaling systems, ticket machines etc.), Beijing Municipal Government is responsible for the investment and construction of the part A and BJMTR of the part B. The total amount of investment made by BJMTR is 15 billion RMB. 

 

Line 16 connects BeiAnHe in the north outside the 6th ring and Wanping in the south. It goes through Haidian, Xicheng, and Fengtai Districts, linking up important functional areas of the city, such as Shanhou in Haidian, SanLiHe Administration Center, Fengtai Railway Station, LiZe CBD and Fengtai Technology Park. It is 49.8 km long with 29 underground stations of which 12 are interchange stations. BJL16 is the first line in Beijing to introduce 8-car type A trains.

 

The north section (Bei’anhe station – Xiyuan station) of Line 16 opens for trial operation on December 31, 2016. As Nongda Nanlu station opens on December 30, 2017, all the 10 stations officially commence service.

 

On December 31, 2020, the middle section of Line 16(Xiyuan station to Ganjiakou station) is seamlessly connected to the north section of Line 16 (Bei’anhe station to Xiyuan station) and opens for trial operation. There are 7 stations on the middle section of Line 16. The opening of Suzhou Jie station and Erligou station is suspended.

 

 

On December 31, 2021, Yuyuantan Park East Gate station of Line 16 commences service.