The middle section of Line 16 operated by BJMTR will open for trial operation tomorrow and connect with the north section

The middle section of Line 16 operated by BJMTR will open for trial operation and connect with the north section on Thursday, December 31, 2020.The middle section of Line 16 starts from Xi Yuan in the north and ends at Ganjiakou in the south, with a route length of 10.9 km and a total of 7 stations. Five stations will open for service, including Wanquan Heqiao Station, Suzhou Bridge Station, Wanshousi Station, National Library Station and Ganjiakou Station from north to south. Through National Library Station, Line 16 can transfer with Line 4 and Line 9. The opening of the two stations, Suzhou Street station and Erligou station is suspended. The connection of the middle and north section of Line 16 will provide greater convenience for residents along the line.